• 
      
    • <ul id="oesoa"></ul>
    • <fieldset id="oesoa"><menu id="oesoa"></menu></fieldset>
    • <strike id="oesoa"></strike>
    • <fieldset id="oesoa"></fieldset>
    • Current Location:Homepage > About Jiahe > news

      The new excavator or the overhauled excavator must pass through a period of trial operation, usually called the walking time. The aim of the walking is to prevent the early wear of the excavator and prolong the life of the excavator. The following provisions must be strictly enforced in the period of the excavator's closing period:

      (1) in the execution period, the excavator should hang the sign of "walking in period" at the obvious place, so that the relevant personnel can pay attention to the provisions of the period of application, and take it off after the expiration of the term.

      (2) running in period 30% engine speed reducer, load 20%-30% operation, no person shall dismantle the engine speed limiting device to be sealed after the expiration of the right under the supervision of technical personnel can be removed.

      (3) the throttle is strictly prohibited when the engine is started. The engine should be preheated for 20-50 seconds at low temperature start, and then start immediately. When the engine starts to run for 3-5 minutes at idle speed, the speed and load can be increased when the cooling water temperature rises to 40 degrees.

      (4) the technical preparation before engine start, the technical requirements during operation, and the technical work before and after the fire are carried out according to the general mechanical operation rules or the requirements of engine operation instructions.

      (5) the excavator should excavate the looser soil in the first 30 or 50 hours of the running period. The loading capacity is 1/2 per time, and the load can increase gradually within 70 or 50 hours later, but it should not exceed 3/4 of the bucket capacity and reduce operation speed appropriately.

      (6) during the running period, we should pay attention to the operation of various excavators, check the working temperature of bearings, gears and friction pairs, and observe whether there is leakage in hydraulic system. The abnormal phenomena in the operation should be stopped immediately to check the causes and be excluded.

      (7) the working conditions of the excavator should be checked, adjusted and lubricated according to the running condition of the closing period. At the same time, check the cleaning of the gear box lubricating oil and hydraulic oil tank, and replace it when necessary.

      TAG:
      All rights reserved::Tai'an Jiahe Heavy Machinery Co., Ltd. 魯ICP備07017427號-6 Technical Support: Interplanetary Network
      主站蜘蛛池模板: 玉蒲团2之玉女心经| 中文字幕色婷婷在线精品中| 抱着cao才爽的视频| 亚洲AV无码专区亚洲AV不卡 | 久久精品视频一区二区三区| 欧美精品在线免费观看| 免费国产精品视频| 脱裙打光屁股打红动态图| 国产在线视频资源| 一级一级女人真片| 在公交车上弄到高c了漫画| 一区精品麻豆入口| 把腿抬起来就可以吃到扇贝了 | 毛片在线观看网站| 免费va人成视频网站全| 美女扒开尿口给男人桶爽视频 | 小向美奈子中出播放| 久久91精品国产91| 日韩在线第一区| 亚洲www视频| 欧美成人国产精品高潮| 亚洲精品成a人在线观看| 真正国产乱子伦高清对白| 啊轻点灬大ji巴太粗太长了h | 午夜网站在线观看免费网址免费| 草草影院最新发布地址| 国产情侣91在线播放| 日本aⅴ日本高清视频影片www| 国产精品狼人久久久久影院| 99久久精品免费看国产一区二区三区 | 久久丫精品久久丫| 日韩1区2区3区| 久草福利资源在线观看| 欧美va亚洲va在线观看| 亚洲国产精品尤物yw在线观看| 波多野结衣一级片| 人碰人碰人成人免费视频| 精品一区二区三区免费毛片爱| 又粗又硬又大又爽免费观看| 色偷偷成人网免费视频男人的天堂| 国产午夜无码精品免费看动漫|